Posts  / ANET  / #POST-229233
REDDIT

mapping the supplier hops for broadcom

R
Jun 4, 2026 · 03:32

Broadcom pumped today but if you map out the hops it’s so obvious it hurts. Hyperscalers don't just buy chips out of nowhere, they need the freaking infrastructure locked in months before. Arista (ANET) gets massive order momentum for high-bandwidth switches the second these guys approve the rack layouts, and SMCI locks in insane non-cancellable backlogs for the actual physical systems before broadcom recognizes a single cent of chip revenue. Even further back AMAT and ASML are getting capacity signals before wafers are even rolling. Stop chasing the headline lagging indicators, watch ANET for the switch wins and SMCI for the rack designs to see where the cash hits first.